|
 |
1996
Pete’s
son, Peter Gagne, lifting Columbia Block Machine #5 with
overhead crane in the Precast building 2000 |
 |
 |
(top
picture) Mining operation line up of front end loaders
used in the daily operations, late 1980’s
(bottom picture) Mining Operation, Thunderbird Crusher
in operation and the set-up of the wash plant, April
1996 |
Fleet
line-up in Belgrade location 2000 |
|
|